I'm ready to get my hands dirty! I might start a little tonight.
Here's the plan:
Thursday:
-drain tank
-remove rear seats and passenger side trim
-uninstall meth kit and package up for Jakey
-remove intercooler
-prep and paint pillar pod
-Install boost refereanced intercooler switch
-have new pump wired up and ready to drop in
-install new boost gauge and pillar pod
-remove downpipe
-check downpipe for leaks in bath tub
-prep and paint downpipe
Friday:
-wrap down pipe
-uninstall intake manifold
-install ss clutch line
-install pitchstop mount
-remove turbo
-remove headers, and upipe
-install new headers and upipe
-install new turbo
-install turbo lines
-rout EWG hose
Saturday:
-bypas PVC
-transfer haness to new manifold
-wire up injectors
-install inlet
-install manifold
-DO NOT FORGET THE PHENOLIC SPACERS
-mount FPR and connect fuel lines
Sunday:
-install intercooler
-drop in fuel pump
-pressure test
-bleed clutch
There is more I'm forgetting but I will add to it shortly.
-----------------------------------------------------------------------------------------
looks pretty good Jared with the right tools you have this running in no time.
Dude if you were here in my town i have all the tools you need and a lift to make it easy for you. I hate workin on my back lol
and one more thing take a lot of pics. If you can film it with ur iphone and upload it in youtube.
good luck Jared =)